File: stage-4-18-stage-4-review.md
Stage 4 Review: Jennifer's first draft (approved)
Where we are: Stage 5 of 5 (Stakeholder Review and Handover). Stages 1 to 4 approved; Stage 4 approved 21-Oct-26
ClearCompare (test case) · 21-Oct-26 · Sample data, cut-off 30-Sep-26. The full results are in the "Standards and Validation" tab.
Stage 4 approved 21-Oct-26
Approved file: 02 - Deliverables/2026.10.21 - ClearCompare - 04 Dashboard.html
Your changes after the first review, all made and checked:
| Change | Result |
|---|---|
| Top 3 actions under the original headline, as 3 cards (owner, action, target and date) | Desktop first screen still fits; cards stack on a phone |
| KPI tile numbers a little bigger (about 33px), every row lined up across the tiles | Rows line up at desktop, tablet and phone |
| "Why it matters" on hover for every KPI tile and every chart | 5 tiles and 11 charts; also on keyboard focus and tap |
| KPI tile numbers count up when the tiles come into view | Lands exactly on the Calculation Pack values; off for reduced motion |
| Progress rings fill the card (504px wide, was 285px), labels beside each ring | Tiles end at 796px on 1280 × 800; phones show the labels as a list |
These rules are now part of Viktor's instructions and the Dashboard Patterns and Data Storytelling guides.
↑ Back to topSummary
- Starting point: Experimental A (progress rings), as chosen at Stage 3
- Fixed already: colourblind-safe category colours, heading order, stage label, spec version
- Result: 30 of 31 checks pass, with 0 console errors and no sideways scroll at any size. The validation checklist passes
- Your decisions (21-Oct-26): changes 1, 2 and 3 approved and made; the clawback rate stays "On track"
- Top 3 actions (21-Oct-26): the original headline stays; under it, the top 3 actions stakeholders need to know (owner, action, target and date), as in Viktor's new rule. Applied to all three Stage 3 versions and the first draft. Tiles still end at 799px on 1280 × 800
Changes approved 21-Oct-26
All three are now in 02 - Deliverables/2026.10.21 - ClearCompare - 04 Dashboard.html.
| Change | Re-check after the change | Result |
|---|---|---|
| 1. Headline and tiles on the first screen | Tiles end at 799px on a 1280 × 800 screen (was 930px). Phone: tiles start at 517px, rings card below them | Passes on desktop. On a phone the first tile shows; the second needs one scroll |
| 2. Chart data points easy to tap | 0 controls under 44px on a touch phone (was 18) | Passes |
| 3. Energy's colour the same on every chart | Energy bar is orange (#db684c) in both charts | Passes |
1. Fit the headline and tiles on the first screen
| First screen | |
|---|---|
| Before | Rings card 527px tall, with a long subtitle and the internal caption "Experimental: radial bars. Bends the rule on honest length…". Tiles end at 930px on a 1280 × 800 screen. On a phone, the rings card sits above the tiles; the first tile starts at 1,062px |
| After | Rings card 397px tall: rings drawn smaller, subtitle "How far each KPI is towards its target, capped at 100%.", internal caption removed (the stakeholder doesn't need it). Tiles end at 799px. On a phone, the tiles come straight after the headline and the rings card moves below them; the first tile starts at 517px |
| Still short | On a phone, the second tile starts just below the first screen because the header takes about 230px. A shorter phone header would fix it: next round, if you want it |
2. Make the chart data points easy to tap
| Bars and conversion rows on touch screens | |
|---|---|
| Before | 18 tappable data points under 44px: bar rows 14px tall, conversion rows 26px |
| After | Each row is 44px tall on touch screens, with the bar drawn in the middle. Mouse screens are unchanged. 0 under 44px |
3. Keep energy's colour the same on every chart
| Net revenue per lead by product area | |
|---|---|
| Before | The energy bar is highlighted in blue; in the lead-mix chart, energy is orange |
| After | The energy bar is orange in both charts, as the caption "Colours follow the product area" promises |
Your decision
Clawback rate status: stays "On track" (decided 21-Oct-26)
| 90-day clawback rate tile | |
|---|---|
| Now | 7.86% against a 7.84% target, shown as "✓ On track" (as in the KPI Calculation Pack) |
| Option | Show "! Behind": strictly, it's 0.02 points over target. This changes a KPI status, so it goes back to Kewpie and the Calculation Pack rather than being changed here |